# Default bail: Failure to produce the accused for extension of time for investigation and custody is in violation of Article 21

- Link: https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/
- Published: 2023-12-21T13:59:50+00:00
- Author: Reshma Azath

Contents

 * [Factual aspects](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#factual-aspects)
 * [Main ground](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#main-ground)
 * [Consideration of submissions](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#consideration-of-submissions)
 * [Special court may extend the period of custody beyond 90 days based on the report of public prosecutor setting out specific reasons](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#special-court-may-extend-the-period-of-custody-beyond-90-days-based-on-the-report-of-public-prosecutor-setting-out-specific-reasons)
 * [Accused is entitled for default bail if the special court does not exercise its power](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#accused-is-entitled-for-default-bail-if-the-special-court-does-not-exercise-its-power)
 * [General principles governing default bail](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#general-principles-governing-default-bail)
 * [The effect of the failure of the respondents to produce the appellants before the special Court at the time of consideration of the Extension application](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#the-effect-of-the-failure-of-the-respondents-to-produce-the-appellants-before-the-special-court-at-the-time-of-consideration-of-the-extension-application)
 * [Presence of accused is necessary to extend the custody](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#presence-of-accused-is-necessary-to-extend-the-custody)
 * [Failure to produce the accused for extension of time for investigation and custody is in violation of Article 21.](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21)
 * [Failure to produce the accused cause prejudices to him](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#failure-to-produce-the-accused-cause-prejudices-to-him)
 * [It was the duty of the Special Court to ensure that this important procedural safeguard was followed](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#it-was-the-duty-of-the-special-court-to-ensure-that-this-important-procedural-safeguard-was-followed)
 * [Party](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#party)
 * [Further study](https://section1.in/default-bail-failure-to-produce-the-accused-for-extension-of-time-for-investigation-and-custody-is-in-violation-of-article-21/#further-study)

##### Factual aspects

2. The appellants are the accused in FIR No.112020082021862020 registered with Jamnagar
City ‘A’ Division Police Station in Gujarat for the offences under Sections 3(1),
3(2), 3(3), 3(4), 3(5), and 4 of The Gujarat Control of Terrorism and Organised 
Crime Act, 2015 (for short ‘the 2015 Act’). Section 167 of the Code of Criminal 
Procedure, 1973 (for short ‘CrPC’) has been amended in relation to the cases involving
offences punishable under the 2015 Act. By virtue of subsection (2) of Section 20
of the 2015 Act, a proviso has been added in addition to the existing proviso to
subsection (2) of Section 167 of CrPC which permits the Special Court established
under the 2015 Act to extend the period of 90 days provided to complete the investigation
up to 180 days. The Special Court is empowered to extend the period up to 180 days
on a report of the Public Prosecutor setting out the progress of the investigation
and the specific reasons for continuing detention of the accused beyond the period
of 90 days.

##### Main ground

4. The main ground urged in support of the appeals is that when the Special Court
passed orders on the reports submitted by the learned Public Prosecutor by which
time to complete investigation was extended up to 180 days, the presence of none
of the accused was procured either physically or through video conference and that
they were not even informed about the reports submitted by the Public Prosecutor.

##### Consideration of submissions

15. We have carefully considered the submissions. The entire issue revolves around
the interpretation of the proviso added by the 2015 Act to subsection (2) of Section
167 of CrPC. For that purpose, we must refer to Section 20 of the 2015 Act. The 
Section reads thus:
“……………………..”

We also reproduce subsections** [(1) and (2) of Section 167 of CrPC](https://www.indiacode.nic.in/show-data?actid=AC_CEN_5_23_000010_197402_1517807320555&sectionId=22559&sectionno=167&orderno=192)**
which read thus:

“……………………..”

##### Special court may extend the period of custody beyond 90 days based on the report of public prosecutor setting out specific reasons

16. Thus, in a case involving the offences punishable under the 2015 Act, the Special
Court is authorized to detain the accused person in custody for a period not exceeding
90 days. The proviso added by subsection (2) of Section 20 of the 2015 Act to subsection(
2) of Section 167 of CrPC enables the Special Court to extend the said period to
a total of 180 days on the basis of a report of the Public Prosecutor setting out
the progress of the investigation and incorporating the specific reasons for the
detention of the accused beyond the period of 90 days.

##### Accused is entitled for default bail if the special court does not exercise its power

17. Thus, unless the Special Court exercises the power under the proviso added by
the 2015 Act to subsection (2) of Section 167 of CrPC, on the expiry of the period
of 90 days, the accused will be entitled to default bail. When the Special Court
exercises the power under the proviso added to subsection (2) of Section 167 of 
CrPC and extends the time up to 180 days, the accused will be entitled to default
bail only if the charge sheet is not filed within the extended period.

##### General principles governing default bail

19. Before we go to the main controversy concerning the legality of the order of
extension passed in exercise of the power under the proviso to subsection (2) of
Section 20 of the 2015 Act, it is necessary to recapitulate the settled law relating
to default bail. Three decisions of the Benches of three Hon’ble Judges of this 
Court have laid down the law on this aspect.

> 19.(a) **[Uday Mohanlal Acharya v. State of Maharashtra](https://main.sci.gov.in/jonew/judis/17702.pdf)**[(
> 2001) 5 SCC 453]. In paragraph 13
> (b) **[M. Ravindran v. Intelligence Officer, Directorate of Revenue Intelligence](https://main.sci.gov.in/supremecourt/2020/8936/8936_2020_39_1501_24488_Judgement_26-Oct-2020.pdf)–**(
> 2021) 2 SCC 485
> (c) The third decision is in the case of **[Rakesh Kumar Paul v. State of Assam](https://main.sci.gov.in/supremecourt/2017/7091/7091_2017_Judgement_16-Aug-2017.pdf)**[(
> 2017) 15 SCC 67]. This decision holds that it is the duty of the learned Magistrate
> to inform the accused, of the availability of indefeasible right under subsection(
> 2) of Section 167 of CrPC once it accrues to him. It was held that this will ensure
> that dilatory tactics of the prosecution are thwarted and obligations under Article
> 21 of the Constitution are upheld.

20. The issue involved in these appeals will have to be decided in the context of
the legal position that the indefeasible right to default bail under subsection (
2) of Section 167, CrPC is an integral part of the fundamental right to personal
liberty under Article 21 of the Constitution of India.

##### The effect of the failure of the respondents to produce the appellants before the special Court at the time of consideration of the Extension application

22. The question before us is about the legal consequences of the failure of the
Special Court under the 2015 Act to procure the presence of the accused at the time
of the consideration of the reports submitted by the Public Prosecutor for a grant
of extension of time to complete the investigation. In addition, we will have to
consider the effect of the failure to give notice to the accused of the reports 
submitted by the Public Prosecutor.

23. Under Clause (bb) of sub section (4) of Section 20 of TADA, there is a pari 
materia proviso that empowers the Designated Court to extend the period provided
in clause (a) of sub section (2) of Section 167 of CrPC.

24. The same issue came up for consideration before the Constitution Bench in this
Court in the case of Sanjay Dutt. A specific submission was made before the Constitution
Bench that the notice to the accused of the application for the extension as contemplated
by the decision in the case of Hitendra Vishnu Thakur1 is not a written notice. 
The argument was that when the report of the Public Prosecutor is considered by 
the Special Court, it is enough that the presence of the accused is procured before
the Special Court and the accused is informed that such a report has been submitted
by the Public Prosecutor.

26. In the case of **[Ateef Nasir Mull](https://main.sci.gov.in/jonew/judis/27135.pdf)
a, **this Court considered a similar provision under POTA. In the said decision,
the law laid down in the case of Sanjay Dutt2 was followed. In the facts of the 
case, it was found that the accused along with his Advocate were present when the
request for extension of time to carry on the investigation was considered by the
Court and, in fact, a copy of the report praying for the extension was provided 
to the accused to enable him to file a reply.

27. In the case of Sanjay Kumar Kedia [(2009)17 SCC 631], this Court considered 
a similar provision under the NDPS Act. However, this Court did not consider the
binding precedent in the case of Sanjay Dutt. Therefore, this decision will not 
be a binding precedent.

##### Presence of accused is necessary to extend the custody

28. Clause (b) of subsection (2) of Section 167 of CrPC lays down that no Magistrate
shall authorise the detention of the accused in the custody of the police unless
the accused is produced before him in person. It also provides that judicial custody
can be extended on the production of the accused either in person or through the
medium of electronic video linkage. Thus, the requirement of the law is that while
extending the remand to judicial custody, the presence of the accused has to be 
procured either physically or virtually. This is the mandatory requirement of law.
This requirement is sine qua non for the exercise of the power to extend the judicial
custody remand. The reason is that the accused has a right to oppose the prayer 
for the extension of the remand. When the Special Court exercises the power of granting
extension under the proviso to subsection (2) of Section 20 of the 2015 Act, it 
will necessarily lead to the extension of the judicial custody beyond the period
of 90 days up to 180 days. Therefore, even in terms of the requirement of clause(
b) of subsection (2) of Section 167 of CrPC, it is mandatory to procure the presence
of the accused before the Special Court when a prayer of the prosecution for the
extension of time to complete investigation is considered. In fact, the Constitution
Bench of this Court in the first part of paragraph 53(2)(a) in its decision in the
case of Sanjay Dutt holds so. The requirement of the report under proviso added 
by subsection (2) of Section 20 of the 2015 Act to clause (b) of subsection (2) 
of Section 167 of CrPC is twofold. Firstly, in the report of the Public Prosecutor,
the progress of the investigation should be set out and secondly, the report must
disclose specific reasons for continuing the detention of the accused beyond the
said period of 90 days. Therefore, the extension of time is not an empty formality.
The Public Prosecutor has to apply his mind before he submits a report/ an application
for extension. The prosecution has to make out a case in terms of both the aforesaid
requirements and the Court must apply its mind to the contents of the report before
accepting the prayer for grant of extension.

29. As noted earlier, the only modification made by the larger Bench in the case
of Sanjay Dutt to the decision in the case of Hitendra Vishnu Thakur is about the
mode of service of notice of the application for extension. In so many words, in
paragraph 53(2)(a) of the Judgment, this Court in the case of Sanjay Dutt2 held 
that it is mandatory to produce the accused at the time when the Court considers
the application for extension and that the accused must be informed that the question
of extension of the period of investigation is being considered. The accused may
not be entitled to get a copy of the report as a matter of right as it may contain
details of the investigation carried out. But, if we accept the submission of the
respondents that the accused has no say in the matter, the requirement of giving
notice by producing the accused will become an empty and meaningless formality. 
Moreover, it will be against the mandate of clause (b) of the proviso to subsection(
2) of section 167 of CrPC. It cannot be accepted that the accused is not entitled
to raise any objection to the application for extension. The scope of the objections
may be limited. The accused can always point out to the Court that the prayer has
to be made by the Public Prosecutor and not by the investigating agency. Secondly,
the accused can always point out the twin requirements of the report in terms of
proviso added by subsection (2) of Section 20 of the 2015 Act to subsection (2) 
of Section 167 of CrPC. The accused can always point out to the Court that unless
it is satisfied that full compliance is made with the twin requirements, the extension
cannot be granted.

##### Failure to produce the accused for extension of time for investigation and custody is in violation of Article 21.

30. The logical and legal consequence of the grant of extension of time is the deprivation
of the indefeasible right available to the accused to claim a default bail. If we
accept the argument that the failure of the prosecution to produce the accused before
the Court and to inform him that the application of extension is being considered
by the Court is a mere procedural irregularity, it will negate the proviso added
by subsection (2) of Section 20 of the 2015 Act and that may amount to violation
of rights conferred by Article 21 of the Constitution. The reason is the grant of
the extension of time takes away the right of the accused to get default bail which
is intrinsically connected with the fundamental rights guaranteed under Article 
21 of the Constitution. The procedure contemplated by Article 21 of the Constitution
which is required to be followed before the liberty of a person is taken away has
to be a fair and reasonable procedure. In fact, procedural safeguards play an important
role in protecting the liberty guaranteed by Article 21. The failure to procure 
the presence of the accused either physically or virtually before the Court and 
the failure to inform him that the application made by the Public Prosecutor for
the extension of time is being considered, is not a mere procedural irregularity.
It is gross illegality that violates the rights of the accused under Article 21.

##### Failure to produce the accused cause prejudices to him

31. An attempt was made to argue that the failure to produce the accused will not
cause any prejudice to him. As noted earlier, the grant of extension of time to 
complete the investigation takes away the indefeasible right of the accused to apply
for default bail. It takes away the right of the accused to raise a limited objection
to the prayer for the extension. The failure to produce the accused before the Court
at the time of consideration of the application for extension of time will amount
to a violation of the right guaranteed under Article 21 of the Constitution. Thus,
prejudice is inherent and need not be established by the accused.

##### It was the duty of the Special Court to ensure that this important procedural safeguard was followed

35. The orders passed by the Special Court of extending the period of investigation
are rendered illegal on account of the failure of the respondents to produce the
accused before the Special Court either physically or virtually when the prayer 
for grant of extension made by the Public Prosecutor was considered. It was the 
duty of the Special Court to ensure that this important procedural safeguard was
followed. Moreover, the oral notice, as contemplated by this Court in the case of
Sanjay Dutt2, was also not given to the accused.

36. Once we hold that the orders granting extension to complete investigation are
illegal and stand vitiated, it follows that the appellants are entitled to default
bail.

##### **Party**

**Jigar @ Jimmy Pravinchandra Adatiya vs. State of Gujarat – Crl. Apl No: 1656 OF
2022 – September 23, 2022.**

**[https://main.sci.gov.in/supremecourt/2021/23563/23563_2021_3_1501_38491_Judgement_23-Sep-2022.pdf](https://main.sci.gov.in/supremecourt/2021/23563/23563_2021_3_1501_38491_Judgement_23-Sep-2022.pdf)**

**[Jigar-@-Jimmy-Pravinchandra-Adatiya](http://localhost:8080/section1/wp-content/uploads/2023/12/Jigar-@-Jimmy-Pravinchandra-Adatiya-1.pdf)**

##### **Further study**

 

 * **[Suspension of sentence: Extension of time](http://localhost:8080/section1/suspension-of-sentence-extension-of-time/)**
 * **[SECTION 173(2) Cr.P.C – INVESTIGATING AGENCY HAS NO OBLIGATION TO FILE THE CHARGE SHEET/REPORTS IN THE LANGUAGE OF THE COURT.](http://localhost:8080/section1/investigating-agency-has-no-obligation-to-file-the-charge-sheet-reports-in-the-language-of-the-court/)**
 * **[LIMITATION OF FILING CHARGE SHEET UNLESS EXTENDED BY THE LAW DOES NOT APPLIES TO CUSTODY U/S 167(2) Cr.P.C.](http://localhost:8080/section1/limitation-of-filing-charge-sheet-unless-extended-by-the-law-does-not-applies-to-custody-u-s-1672-cr-p-c/)**
 * **[Section 167(2) Cr.P.C – Default Bail and its Cancellation.](http://localhost:8080/section1/section-1672-cr-p-c-default-bail-and-its-cancellation/)**
 * **[GIVING UP WITNESS BY PROSECUTOR](http://localhost:8080/section1/giving-up-witness-by-prosecutor/)**

### Further Study

 No Related Posts Found.
